Daily News Wrap-Up: Greenko Partners with Keppel to Produce Green Ammonia

Exide Industries starts construction of lithium-ion cell manufacturing facility in Bengaluru

thumbnail

Here are some noteworthy cleantech announcements of the day from around the world:

Keppel Infrastructure Holdings and Greenko Group, through their subsidiaries, signed a memorandum of understanding to jointly explore green ammonia and renewable energy opportunities to meet the growing demand for low-carbon energy in India, Singapore, and globally. Keppel will collaborate with Greenko to explore the feasibility of jointly developing a production facility that can produce at least 250,000 tons of green ammonia per year. The companies will also identify and evaluate a portfolio of solar and wind energy projects of approximately 1.3 GW installed capacity, complemented by pumped hydro-storage, to power the green ammonia production facility.

Exide Industries broke ground for its first lithium-ion cell manufacturing facility at the Hi-Tech Defense & Aerospace Park Phase 2, Bengaluru. The event marked the formal start of construction of the first multi-gigawatt-hour lithium-ion cell manufacturing facility, which will be spread over 80 acres of land. It will produce technology-leading lithium-ion batteries to suit varied electric vehicle (EV) and industrial segment requirements. Exide has entered into a multi-year technical collaboration agreement with SVOLT Energy Technology, a global technology company that makes and develops lithium-ion batteries and battery systems for EVs and energy storage. In addition to technology, SVOLT would support setting up the plant on a turnkey basis. The facility’s first phase is expected to be operational by the end of 2024.

Saint-Gobain announced that it has signed a ten-year renewable power purchase agreement (PPA) with TotalEnergies to purchase 200 MW of solar power for its 145 industrial sites in North America. The PPA is expected to offset Saint-Gobain’s North American CO2 emissions from electricity under the scope 2 emissions by 210,000 metric tons per year, a reduction of around 33%. The agreement is expected to start at the end of 2024 and is the second PPA signed in North America by Saint-Gobain, the first being a wind project in Blooming Grove, Illinois, in the U.S. The two projects combined are expected to represent a 62% reduction in Saint-Gobain North America’s scope 2 emissions.

Trina Solar launched the Vertex N 595W solar photovoltaic module for C&I and utility-scale projects. Together with the Vertex N 690W for utility scenarios and Vertex S+ 445W for rooftop PV systems, Trina Solar’s n-type module portfolio is based on the leading 210 product technology platform and n-type i-TOPCon cell technology. The Vertex N module, with its dual-glass module, increases bifaciality to 80% and delivers higher efficiency, lower degradation, and better energy yield, delivering lower BOS and LCOE to projects. The Vertex N 595W modules adopt the latest 210 product platform +i-TOPCon technology and are highly compatible with trackers, offering more feasibility to utility-scale projects in the most complex terrain. The new generation of Vertex N modules will be in mass production by the end of 2022, and over 10 GW n-type modules capacity is expected to release by the first quarter of 2023. The capacity of n-type modules will reach 20 GW to 30 GW by the end of next year.

RAW Charging, a UK-based electric vehicle charging solutions provider, has reached an agreement with SolarBotanic Trees to initially supply 200 co-branded solar trees as part of their network of commercial electric vehicle charging sites currently being rolled out across the UK and Europe.  Deliveries for the solar trees are expected to start in mid-2023 and be complete in 2024. The SolarBotanic Tree is said to be an aesthetically attractive solar power system that generates electricity and will initially be integrated into the existing RAW Charging site infrastructure to supplement its renewable power requirement. In the longer term, the SolarBotanic Tree would incorporate RAW’s industry-leading hardware and battery storage into the solar tree structure.

RELATED POSTS

Get the most relevant India solar and clean energy news.

Featured
thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open ...

March 16, 2023

Markets & Policy

25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity. Stakehold...

November 9, 2022

Mercom Research Focus

India’s Solar Market Leaders for 1H 2022

Mercom India has released its report, India Solar Market Leaderboard 1H 2022, unveiling solar market leaders in the first half (1H) of the calendar year (CY) 2022. The report covers market share and shipment rankings across the In...

November 9, 2022

Energy Storage

Webinar to Shed Light on How Battery Storage Enhance Solar Systems’ Performance

Battery energy storage technologies globally are transforming how companies utilize, control, and dispatch electricity and facilitating a smoother transition to clean energy. The Indian market is also realizing how battery storage...

November 9, 2022

Magazine

DON'T MISS AN ISSUE!

Mercom Cleantech Magazine

Get Your Copy Today!

magazines

Latest News

Test Video Post2

This is custom content that will be displayed at the video in case you want to give an overview, etc. Michael Ballard

November 30, 2022

thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open...

March 16, 2023

thumbnail
25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity....

November 9, 2022

JANUARY 2023

Some test content that can be displayed somewhere maybe if needed? Not sure Michael Ballard

November 30, 2022

DECEMBER 2022

December 2022 Magazine Post Michael Ballard

March 2, 2023

NOVEMBER 2022

March 2, 2023

Mercom India Renewables Summit 2023

OUR FLAGSHIP EVENT, MERCOM INDIA RENEWABLES SUMMIT, APRIL 2023   Mercom India Renewables Summit 2023 (formerly Mercom India Solar Summit) brings together developers, manufacturers, investors, innovators, and other key decision...

November 28, 2022

thumbnail
PTC India’s EoI to Procure 1 GW of Hybrid Power Receives Overwhelming Response

PTC India’s expression of interest (EoI) to procure 500 MW of hybrid renewable energy (wind and solar) (Tranche-I), with a greenshoe option for an additional 500 MW, has received a strong response, according to Mercom sources....

November 9, 2022

thumbnail
Higher Operating Costs Drive Fuel Cell Firm Ballard’s Net Loss Up 39% YoY in Q3

Ballard Power Systems, a fuel cell and clean energy solutions provider, recorded a net loss of $42.88 million in the third quarter (Q3) of 2022, a year-over-year (YoY) increase of 39%. The revenue for the quarter was $21.34...

November 9, 2022

thumbnail
Solid Power Posts Loss of $12.4 Million in Q3 As Operating Expenses Soar

Solid Power, Inc., a U.S.-based developer of all-solid-state battery cells for electric vehicles (EVs), reported a net loss of $12.4 million for the third quarter (Q3) 2022, a 46% increase from the $8.45 million loss during the...

November 9, 2022

MORE NEWS