Daily News Wrap-Up: Tender Clauses Amended for KUSUM Solar Pumps Program

Trident group installs 8.87 MW solar power at Budhni, Madhya Pradesh

thumbnail

Here are some noteworthy cleantech announcements of the day from around the world:

The Ministry of New and Renewable Energy announced amendments to the tender provisions for empaneling vendors under Component B of the PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan) program. Under component B, the target is to install 1.75 million standalone solar-powered agriculture pumps of individual capacity up to 7.5 HP. As per the new amendments, the rates discovered in the centralized tender will serve as a ceiling for any bids called by the state implementing agencies (SIAs). SIAs can implement their prices only in cases where prices have not been discovered in the centralized tender for that state, or there are not enough vendors through centralized tendering, or these vendors cannot complete timely installation. If the prices of the pumps of these capacities are discovered in the neighboring states or union territories, the same can serve as the ceiling price. Empaneled vendors who do not complete the installation of the pumps will be blacklisted for five years.

Trident Group, a textiles and paper conglomerate, announced that it has completed installing an 8.87 MW solar power project at Budhni, Madhya Pradesh. The project was commissioned in two phases – a 5.48 MW solar power project (Phase I) and a 3.39 MW solar power project (Phase II), for captive use. The power generated from the project would be consumed by manufacturing facilities located at Budhni, resulting in considerable savings for the company. The group aims to use renewable and clean energy to reduce carbon emissions.

ArcelorMittal, Mitsubishi Heavy Industries Engineering, BHP, and Mitsubishi Development will collaborate on a multi-year trial of carbon capture technology with ArcelorMittal. The trial involves ArcelorMittal’s steel plant in Ghent, Belgium, as well as another unspecified site in North America, and aims to identify means of enhancing the feasibility of carbon capture utilization and/or storage (CCUS) technologies in the global steelmaking industry. Currently, there are no full-scale operational CCUS facilities in blast furnace steelmaking operations, with only a limited number of small-capacity carbon capture or utilization pilots underway or in the planning phases globally. However, later this year, ArcelorMittal Gent will commission its Steelanol project, a scale demonstration plant that will capture carbon-rich process gases from the blast furnace and convert them into ethanol.

Indian Hotels Company (IHCL), in line with the company’s ESG+ framework, has installed 224 electric vehicle (EV) charging stations at 92 properties. These EV charging points, in collaboration with Tata Power, are present across various Taj, SeleQtions, Vivanta, Ginger, and amã Stays & Trails properties across the country. The move is aligned with IHCL’s commitment to cater to the evolving needs of its customers by reducing their carbon footprint in travel. These chargers can be accessed by guests staying at various IHCL properties.

Hydrogen systems supplier Hexagon Purus and green hydrogen producer Lhyfe entered into commercial cooperation to deliver Hexagon Purus’ type 4 hydrogen distribution systems. As a result, Lhyfe can deliver a maximum of 19 tons of green hydrogen per trip, corresponding to the consumption of 650 transit buses. Type 4 hydrogen distribution system is a composite high-pressure cylinder technology used for bulk distribution of compressed hydrogen. Hexagon Purus’ products are used in various applications, including light, medium, and heavy-duty vehicles, buses, ground storage, distribution, refueling, maritime, rail, and aerospace. Lhyfe has a commercial pipeline representing a total production capacity of 9.8 GW by 2030.

RELATED POSTS

Get the most relevant India solar and clean energy news.

Featured
thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open ...

March 16, 2023

Markets & Policy

25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity. Stakehold...

November 9, 2022

Mercom Research Focus

India’s Solar Market Leaders for 1H 2022

Mercom India has released its report, India Solar Market Leaderboard 1H 2022, unveiling solar market leaders in the first half (1H) of the calendar year (CY) 2022. The report covers market share and shipment rankings across the In...

November 9, 2022

Energy Storage

Webinar to Shed Light on How Battery Storage Enhance Solar Systems’ Performance

Battery energy storage technologies globally are transforming how companies utilize, control, and dispatch electricity and facilitating a smoother transition to clean energy. The Indian market is also realizing how battery storage...

November 9, 2022

Magazine

DON'T MISS AN ISSUE!

Mercom Cleantech Magazine

Get Your Copy Today!

magazines

Latest News

Test Video Post2

This is custom content that will be displayed at the video in case you want to give an overview, etc. Michael Ballard

November 30, 2022

thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open...

March 16, 2023

thumbnail
25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity....

November 9, 2022

JANUARY 2023

Some test content that can be displayed somewhere maybe if needed? Not sure Michael Ballard

November 30, 2022

DECEMBER 2022

December 2022 Magazine Post Michael Ballard

March 2, 2023

NOVEMBER 2022

March 2, 2023

Mercom India Renewables Summit 2023

OUR FLAGSHIP EVENT, MERCOM INDIA RENEWABLES SUMMIT, APRIL 2023   Mercom India Renewables Summit 2023 (formerly Mercom India Solar Summit) brings together developers, manufacturers, investors, innovators, and other key decision...

November 28, 2022

thumbnail
PTC India’s EoI to Procure 1 GW of Hybrid Power Receives Overwhelming Response

PTC India’s expression of interest (EoI) to procure 500 MW of hybrid renewable energy (wind and solar) (Tranche-I), with a greenshoe option for an additional 500 MW, has received a strong response, according to Mercom sources....

November 9, 2022

thumbnail
Higher Operating Costs Drive Fuel Cell Firm Ballard’s Net Loss Up 39% YoY in Q3

Ballard Power Systems, a fuel cell and clean energy solutions provider, recorded a net loss of $42.88 million in the third quarter (Q3) of 2022, a year-over-year (YoY) increase of 39%. The revenue for the quarter was $21.34...

November 9, 2022

thumbnail
Solid Power Posts Loss of $12.4 Million in Q3 As Operating Expenses Soar

Solid Power, Inc., a U.S.-based developer of all-solid-state battery cells for electric vehicles (EVs), reported a net loss of $12.4 million for the third quarter (Q3) 2022, a 46% increase from the $8.45 million loss during the...

November 9, 2022

MORE NEWS