Texas-Based Module Maker Mission Solar Energy to Expand Production Capacity by 1 GW

OCI Company Limited will provide polysilicon to Mission Solar to produce more modules

thumbnail

Texas-based solar modules manufacturer Mission Solar Energy has announced a 1 GW module capacity expansion plan to meet the demand for 2023 and beyond.

Mission Solar’s announcement follows the passage of the U.S. Inflation Reduction Act (IRA), which incentivizes the local manufacturing plans of renewable energy companies. The IRA provides billions of dollars in tax credits and other incentives to solar manufacturers in the U.S. to encourage domestic manufacturing and compete with imported solar products.

The company said it would add to its 300 MW production capacity in San Antonio immediately, with plans to reach an annual capacity of 1 GW in the next two years. The facility’s expansion is scheduled to commence by the fourth quarter of 2022.

Mission Solar’s Seoul-based parent organization OCI Company will play a vital role in the expansion by providing polysilicon to produce modules.

Mission Solar Energy’s President and CEO Jae Yang said, “By 2035, solar installations are expected to quadruple from current levels. At present, four percent of the electricity fed to American energy grids is generated by solar. The U.S. aims to have 40 percent of its electricity generated by solar technology by 2035. These are exciting opportunities for us as a company. Additional motivated team members will be needed to help us build a greener future.”

Mission Solar has a 246,000-square-foot manufacturing facility in south San Antonio at Brooks.

In September, U.S-based solar module maker First Solar announced investing $1.2 billion to scale the production of its American-made, cadmium telluride thin-film solar modules totaling 4.4 GW, to support the country’s transition to decarbonization in the next three years.

We expect many more companies to expand capacities or announce new manufacturing facilities to take advantage of IRA incentives in the near future.

RELATED POSTS

Get the most relevant India solar and clean energy news.

Featured
thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open ...

March 16, 2023

Markets & Policy

25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity. Stakehold...

November 9, 2022

Mercom Research Focus

India’s Solar Market Leaders for 1H 2022

Mercom India has released its report, India Solar Market Leaderboard 1H 2022, unveiling solar market leaders in the first half (1H) of the calendar year (CY) 2022. The report covers market share and shipment rankings across the In...

November 9, 2022

Energy Storage

Webinar to Shed Light on How Battery Storage Enhance Solar Systems’ Performance

Battery energy storage technologies globally are transforming how companies utilize, control, and dispatch electricity and facilitating a smoother transition to clean energy. The Indian market is also realizing how battery storage...

November 9, 2022

Magazine

DON'T MISS AN ISSUE!

Mercom Cleantech Magazine

Get Your Copy Today!

magazines

Latest News

Test Video Post2

This is custom content that will be displayed at the video in case you want to give an overview, etc. Michael Ballard

November 30, 2022

thumbnail
14:46 Installs a Record 2.5 GW of Solar Open Access in 2022, Up 92% YoY

India added 2.5 GW of solar open access in the calendar year (CY) 2022, a year-over-year (YoY) increase of 92% from the 1.3 GW installed in CY 2021, according to the newly released 2022 Q4 & Annual Mercom India Solar Open...

March 16, 2023

thumbnail
25% of Generation Capacity of Coal Plants Must be from Renewables: Ministry of Power

The Ministry of Power (MoP) has proposed that any coal-based thermal generation station coming up after April 1, 2024, must either install or procure renewable energy equivalent to 25% of the thermal generation capacity....

November 9, 2022

JANUARY 2023

Some test content that can be displayed somewhere maybe if needed? Not sure Michael Ballard

November 30, 2022

DECEMBER 2022

December 2022 Magazine Post Michael Ballard

March 2, 2023

NOVEMBER 2022

March 2, 2023

Mercom India Renewables Summit 2023

OUR FLAGSHIP EVENT, MERCOM INDIA RENEWABLES SUMMIT, APRIL 2023   Mercom India Renewables Summit 2023 (formerly Mercom India Solar Summit) brings together developers, manufacturers, investors, innovators, and other key decision...

November 28, 2022

thumbnail
PTC India’s EoI to Procure 1 GW of Hybrid Power Receives Overwhelming Response

PTC India’s expression of interest (EoI) to procure 500 MW of hybrid renewable energy (wind and solar) (Tranche-I), with a greenshoe option for an additional 500 MW, has received a strong response, according to Mercom sources....

November 9, 2022

thumbnail
Higher Operating Costs Drive Fuel Cell Firm Ballard’s Net Loss Up 39% YoY in Q3

Ballard Power Systems, a fuel cell and clean energy solutions provider, recorded a net loss of $42.88 million in the third quarter (Q3) of 2022, a year-over-year (YoY) increase of 39%. The revenue for the quarter was $21.34...

November 9, 2022

thumbnail
Solid Power Posts Loss of $12.4 Million in Q3 As Operating Expenses Soar

Solid Power, Inc., a U.S.-based developer of all-solid-state battery cells for electric vehicles (EVs), reported a net loss of $12.4 million for the third quarter (Q3) 2022, a 46% increase from the $8.45 million loss during the...

November 9, 2022

MORE NEWS